LOCATIONS

HARVEY LOCATION

Premier Harvey offers expansive facilities designed for the demands of fabrication and heavy lift. It’s a work-flow efficient yard well equipped to handle even the most demanding project requirement.

Located on the Harvey Canal near New Orleans, the yard provides direct access to the Gulf of Mexico by boat and barge.

Services:

  • Project Management
  • Fabrication and Repair
  • Production Facilities
  • Production Modules
  • Onshore and Offshore Construction and Maintenance Crews
  • Compressor Packages
  • Sandblasting and Painting

Facility Specifications:

  • ASME “U” Stamp and
    NBIC “R” Stamp
  • 17 Workstations
  • 11.5 Acre Area
  • 1450 Linear Foot Bulkhead (Includes 300' x 250' Slip)
  • 12 Foot Water Depth
  • 150 Ton Crane Capacity
  • 22,400 Square Foot Covered
    Shop Area
  • Barge Capacity at Dock:
    Three 100' x 300'
  • 100' x 200' Sandblast/Paint Area
  • Load Outs
    - Yard Crane to 70 Tons
    - Contract Derrick Barge to 1,000 Tons
    - Skid Load Out 2,500 Tons